Brief Description: complete left side and right side panel etc.
I completed the fabricating and installation of the left front side panel and parking brake mount. Everything is riveted, nut plates installed and in place.
On to the right side. The patterns were close, with some small adjustments. The adjustments were made by adding masking tape and a small amount of trimming. The net result was that the right side went quickly.
The close out panels will get covered with either cloth or leather upper and a contrasting cloth or carpet lower section. I also plan on adding some side wall insulation at a later date (might still need to add a few wires through the area.)