KitLog pro

Powered By Kitlog Pro v2.0

Leos Web Site
' style=
Date:  12-5-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  run pneumatics Pitot, AOA and static lines

I plumed in the static line that was run forward a long time ago to the GSU 25 (ADHRS), the G5 and the alternate static switch. These lines are white

My biggest problem to solve was routing of the AOA and Pitot lines to the right-wing root without drilling new holes over the wing spar carry through. Too many wires already fill the holes on the right side. The left side required crossing the plane under the flap torque tube covers which also already has many obstructions installed. The solution was to run them down the top edge of the center tunnel. This is also a compromise as I will need clear access for the fuel line and filter maintenance. Not too bad though attached tightly to the top.

Pitot attaches to the GSU25 and the G5 These lines are Blue

AOA only to the GSU25. This line is red.
' style=

tunnel routing of pneumatics

tunnel routing of pneumatics

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.