The finish kit arrived today. I think the freight company wanted to remind the driver to collect the freight $ charges $. I unpcaked everything down to the sub kits, but still need to do a detailed inventory.
First things first, I installed the left seat to get a feel for the final seated position. I needed to see if my overhead switch position would be too close to my head. Well, I am pleased with the location and will move forward with the instalation.
I am also working on the wiring harness for the footwell lighting.It needs to remain seperate from the switch back lighting so it can be dimmed seperatly from the overhead switch panel