KitLog pro

Powered By Kitlog Pro v2.0

Leos Web Site
' style=
Date:  10-10-2015
Number of Hours:  5.00
Manual Reference:  
Brief Description:  finialize left seat and rear floors

I have to wait on the right floors until my wife feels better and can buck the balance of the tailcone rivets.

The insulation is completed on the left side and the floors are riveted in. The baggage door rear frame is installed along with all of the nut plates on the left side. At this point, no more acces to the underside of the floor.

I also ran the next section of brake line now that the landing gear brackets are installed. They went in suprisingly easy. I guess the proof will be when I bleed the lines and check for leaks under pressure.

Tomorrow I will start on the front upper or one of the systems if the rivets aren't completed. It's not like there arn't other things to work on.
' style=

left rear seat

left rear seat

' style=

left baggage floor

left baggage floor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.