Powered By Kitlog Pro v2.0
Leos Web Site
RV-10
All
9-19-2015
< Previous Log Entry
Next Log Entry >
Date:
9-19-2015
Number of Hours:
8.00
Manual Reference:
Brief Description:
Left skins complete, left floor in
I got the left forward and mid skin riveting completed. Installing the vent before installing the skin was much cleaner and easier.
The insulation under the left floor is complete, the floor in place and all that remains, is to pull the rivets.
Next step is the gear mounts.
inside view
front floors in
looking aft
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
465
3762
Avionics
9
55
Avionics
10
48
Canopy
9
55
Commentary
3
20
Controls
14
72
Cowel
4
48
Doors
17
100
Doors
30
263
Electrical
57
419
Electrical
10
82
Empennage
10
98
Engine
24
224
Fuselage
52
355
Horz Stab and Elevat
6
36
Instrument Panel
57
419
Interior
14
72
Interior
30
263
Misc.
6
57
Miscellaneous
6
57
None
2
Overhead
8
49
Painting
9
307
Prop
1
20
Stabilizer/Elevator
10
82
Tailcone
17
100
Things learned
8
49
Vert Stab and Rudder
3
20
Vert Stab/Rudder
6
36
What have I learned
2
2
Wings
31
354
Copyright © 2001-2024 Matronics. All Rights Reserved.