Brief Description: fitting the landing gear mounts
Next steps were tho fabricate the front seat bottoms, fabricate the mid seat rail brackets, and final drill the landing gear mounts. Getting the landing gear mounts in, even for a temporary fitting is a bit of a challange. Like everything else it comes back out after final drilling to be deburred and set aside for later. Adding 4 nutplates finishes the section. The plans have a small typo here calling for a #3 nutplate when a #4 is the correct size to fit an AN3 bolt. (i think)
Section 28 is complete. Section 29 is the side skins and under structure (longerons etc.)