Brief Description: Finished 2 of the 3 landing gear bulkheads
The 3 beveled edges of the forward landing gear bulkhead top half were trimmed using both a hack saw and an electric handsaw. All edges were sanded. The bulkhead was vacuumed.
This piece is now complete as far as Chapter 4 goes. Other builders sites recommend leaving the holes to be drilled until after installation of this piece in a subsequent chapter. By waiting, this provides better alignment of the torque tube holes through the bulkheads.
I hung the finished bulkhead on the shop wall with the instrument panel.
The aft landing gear bulkhead was sanded then vacuumed and stored away.