Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chap 4 : Bulkheads
9-26-2010
< Previous Log Entry
Next Log Entry >
Date:
9-26-2010
Number of Hours:
1.00
Manual Reference:
Chapter 4
Brief Description:
Clean Shop for F22 forward layup
I noticed some rust marks on the aft face of F22 from the band saw, so I went after the band saw with some steel wool before cleaning up the shop.
The shop was covered in dust from cutting and sanding so I swept and vaccuumed.
I cleaned off the table last and layed a clean length of vapour barrier over the work table.
I glued some scrap foam pieces to the plastic. These pieces will support F22 so that it lies flat during the forward face layup.
Time to clean up
F22 forward face up
Jenna inspecting
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.