2 plies of BID cloth @45deg was cut for the F22 doubler.
1 ply of UND cloth (horizontal orientation) was cut for the F22 doubler with enough cloth for a 1" lap onto F22 at C-C as shown on drawing M4.
1 ply of peel ply was cut to cover the entire piece.
Wax paper was cut to cover the peel ply.
All plies were labeled using different colout sticky notes. The notes included a number representing which layer of the layup it was along with any other information to assist during the layup work.