Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chap 4 : Bulkheads
8-29-2010
< Previous Log Entry
Next Log Entry >
Date:
8-29-2010
Number of Hours:
1.00
Manual Reference:
Chapter 4
Brief Description:
F28 forward face layup
2 plies of BID @ 45 degrees was cut and 1 horizontal ply of UND. Peel ply and wax paper was cut prior to layup.
Shop humidity was about 70 % so I used a dehumidifier to bring it down to 60%. Shop temperature was 82 degrees F.
Micro was squeege'd onto the forward face of the F28 foam shape.
2 plies of BID and 1 horizontal ply of UND were layed up on the forward face and scissor trimmed.
Peel ply was added to the layup, then wax paper. A wooden board was placed on the wax paper then bricks were added for weight.
Ready for the layup
Weights added on top of layup
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.