Brief Description: Prepare tape for seat brace and heat duct joints
Removed the 2x4s and clamps from the heat duct and seat brace assembly.
Prepared 2” wide tape joints to reinforce the seat brace & heat duct at the bulkheads. Dacron and 2 plies of BID cloth at 45 deg C were placed on a wax paper template.