Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chapter 6: Fuselage
12-2-2017
< Previous Log Entry
Next Log Entry >
Date:
12-2-2017
Number of Hours:
2.00
Manual Reference:
Brief Description:
Glass the heat duct with 2 ply BID
Now to cover the outside of the heat duct with 2 plies of BID at 45 deg. top and sides.
Workshop temperature 25 deg C and humidity 48%.
Mixed a batch of epoxy with 146g resin and 56g hardner. Poured some of it in another cup and added micro bubbles.
Applied micro to the foam on the outside of the heat duct and applied epoxy to the existing glass surface on top of the heat duct.
Applied 2 plies of BID and covered the layup with Dacron. Curing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.