Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chapter 6: Fuselage
10-6-2017
< Previous Log Entry
Next Log Entry >
Date:
10-6-2017
Number of Hours:
3.00
Manual Reference:
Brief Description:
Flox heat duct together
Drilled holes through the fiberglass in the triangular braces for the aluminum tube.
Used 5 minute epoxy to put the top pieces of the heat duct together.
Clamped the 3 heat duct pieces to a 2 x 4 for trial fit before floxing. This took awhile to get the pieces oriented and aligned correctly.
Shop temperature set to 25 deg C and humidity 52%.
40g resign and 15.2g hardner mixed with flox and applied to the heat duct to secure the sides to the top. Curing in progress.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.