Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chapter 6: Fuselage
4-29-2017
< Previous Log Entry
Next Log Entry >
Date:
4-29-2017
Number of Hours:
1.00
Manual Reference:
Brief Description:
Flox fwd landing gear bulkhead in place
Workshop temperature was 25 deg C and 47% humidity.
15g Resin was mixed with 6g hardner and flox.
Flox was applied to all mating surfaces between the fuselage sides and the front landing gear bulkhead.
The bulkhead was positioned in place, and centerline verified.
It was blocked into position and left to cure.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.