Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
2-17-2019
< Previous Log Entry
Next Log Entry >
Date:
2-17-2019
Number of Hours:
2.00
Manual Reference:
step 2
Brief Description:
Leveled Fuselage & Cut Cloth
Ensured the longerons are level side to side and front to back.
Placed plastic on the floor in preparation for glassing the bottom of the fuselage.
Cut 4" wide strips of UND cloth to install reinforcing layups for the landing gear hardpoints and the engine mount hardpoints as per figure 19.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.