Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
1-1-2019
< Previous Log Entry
Next Log Entry >
Date:
1-1-2019
Number of Hours:
1.50
Manual Reference:
Step 2
Brief Description:
Temporarily Install the Landing Brake
Vacuumed the landing brake and the fuselage where the landing brake is installed.
Tacked the landing brake in place with 5 minute epoxy.
Canadian Tire didn't have 1" wide duct tape so I cut a standard duct tape width to 1".
I built up the area 1" wide alongside and aft of the landing brake with 1" duct tape until it was flush with the landing brake.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.