Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
11-4-2018
< Previous Log Entry
Next Log Entry >
Date:
11-4-2018
Number of Hours:
2.50
Manual Reference:
Step 1
Brief Description:
Glass inside of scoop (aft section)
Sized paper (templates) to fit in the forward and aft scoop sections such that it will be 1/4" past the edges and >3/4" onto the bulkheads.
Cut 2 ply of BID cloth to the size of the templates.
Cut peel ply.
Workshop temperature 24deg C and humidity 52%.
Mixed a batch of epoxy using 152g resin and 58g hardner.
Wet out the 2-ply BID cloth for the aft scoop section.
Mixed a small batch of dry micro to fill any gaps in the aft scoop foam.
Mixed a batch of micro to cover the foam. Used epoxy to wet the bulkheads where they overlap with the cloth.
Placed the 2-ply BID cloth in the scoop and scissor trimmed the edges to ~1/4" past the edges.
Applied peel ply and more epoxy.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.