KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  11-4-2018
Number of Hours:  2.50
Manual Reference:  Step 1
Brief Description:  Glass inside of scoop (aft section)

Sized paper (templates) to fit in the forward and aft scoop sections such that it will be 1/4" past the edges and >3/4" onto the bulkheads.

Cut 2 ply of BID cloth to the size of the templates.

Cut peel ply.

Workshop temperature 24deg C and humidity 52%.
Mixed a batch of epoxy using 152g resin and 58g hardner.

Wet out the 2-ply BID cloth for the aft scoop section.

Mixed a small batch of dry micro to fill any gaps in the aft scoop foam.

Mixed a batch of micro to cover the foam. Used epoxy to wet the bulkheads where they overlap with the cloth.

Placed the 2-ply BID cloth in the scoop and scissor trimmed the edges to ~1/4" past the edges.

Applied peel ply and more epoxy.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.