KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  10-28-2018
Number of Hours:  1.50
Manual Reference:  NACA Scoop
Brief Description:  Rout foam for aluminum inserts

Expanded the tip of the NACA scoop from 0.5" to between 0.75" and 1".

Added joggles, for the landing gear cover, to the vertical sections of the aft landing gear bulkhead.

Lauryn was able to crawl into the space between the landing gear bulkheads and mark the locations for the aluminum inserts.

Using a 1/4" drill, I routed out the foam between the glassed faces a little more than 1/2" wide and 1/4" deep at the locations where the inserts will be installed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.