KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  7-7-2018
Number of Hours:  2.00
Manual Reference:  NACA Scoop
Brief Description:  NACA Scoop Part D

Removed the weights from the 2" and 1" thick foam pieces and removed the nails from the birch plywood pieces now that they have all cured in place.

Cut 1" thick urethane blocks to fit outside the birch plywood pieces.

Fabricated parts D from birch plywood and tapered to fit between the aft landing gear bulkhead and the firewall. Pre-drilled nail holes in parts D to hold them in position between the bulkheads.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.