Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
4-15-2018
< Previous Log Entry
Next Log Entry >
Date:
4-15-2018
Number of Hours:
2.00
Manual Reference:
step 3
Brief Description:
Taped floor to landing gear bulkhead corner
Removed the temporary board supporting the aft end of the floor then scraped the glue from the landing gear bulkhead.
Shop temperature 25 deg C and humidity 41%.
Cut 2 pieces of BID cloth 33" x 2".
Mixed a cup of epoxy using 112g resin and 42g hardner.
Wet out the 2-ply BID tape then applied epoxy to the corner of the landing gear and floor.
Mixed a batch of flox and applied it to the corner.
Cut out the BID tape and applied it to the corner and used a brush to stipple the tape.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.