Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
3-31-2018
< Previous Log Entry
Next Log Entry >
Date:
3-31-2018
Number of Hours:
3.50
Manual Reference:
step 3
Brief Description:
Permanent floor installation
Permanent Installation of the aircraft floor.
Shop temperature was 25 deg C and humidity 39%.
Several batches of medium stiff flox was mixed.
The flox was applied on all the mating surfaces: longerons, seatback, heat duct, and front bulkhead F22.
Shims were positioned and floxed.
Noah helped me lift the floor off the work table onto the fuselage.
The floor was positioned properly and then weights and clamps were used to hold it in place during cure.
Excess flox inside and out of the fuselage was wiped away.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.