KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  3-25-2018
Number of Hours:  1.50
Manual Reference:  step 3
Brief Description:  Positioning & Fitting floor into fuselage assembly

Positioned floor in place.

Sanded and used the dremel tool to level the floor at the front where it mates with bulkhead F-22.

Hot glued a temporary block to the forward landing gear bulkhead 1/4” below the scoop cut out to support the fuselage floor while it cures in place. This positions the floor 1/8" above the cutout.

Weighed down the floor and clamped the sides to uncover areas needing shims.

Started shimming any gaps on the sides.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.