KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  2-24-2018
Number of Hours:  1.00
Manual Reference:  step 3
Brief Description:  Position floor on worktable for glassing

Positioned the floor back on the worktable for glassing.

Additional wood and shims were added to the bottom side of the aircraft floor to maintain the right shape on the worktable.

45 degree lines were drawn on the floor for fibreglass orientation.

More BID glass cloth and 3M glass bubbles were ordered from Aircraft Spruce Canada in preparation for glassing the floor.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.