KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-18-2017
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Trimming and Sanding the bulkheads

Trimmed and sanded the edges of the 7-layer UND layup on the heat duct and the edges of the 2-layer BID layup on the seat brace.

Cut the 2 holes for the electrical channel out of the firewall. Cut and sanded the firewall longerons, and stringers to be flush with the firewall. Trimmed and sanded the firewall 2" taped joints.

Removed excess wood and flox from bulkhead F22 and removed excess epoxy from the bottom of the longerons and front seatback.

Workshop temperature was 23 deg C and humidity 58%. Mixed 15g resin with 6g hardner and flox. Floxed a small piece of wood (same wood as used for the permanent firewall) to build up the bottom of the instrument panel. Floxed in place, clamped, and left to cure.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.