Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
10-20-2017
< Previous Log Entry
Next Log Entry >
Date:
10-20-2017
Number of Hours:
1.00
Manual Reference:
Chapter 6
Brief Description:
Flox Fuel Valve & Bracket Assembly in place
The fuel valve was covered in saran wrap to avoid it being floxed in place since it needs to be removable.
The bracket was traced onto the triangular brace where the flox is applied.
Workshop temperature was 25 deg C and the humidity 56%.
15g resin, 6g hardner, and flox were mixed together.
The 3/8″ x 2″ aluminum tube was floxed into place.
Flox was applied to the triangular brace and the fuel valve and bracket assembly was placed in position for curing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.