KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  9-9-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Permanently Install Lower Firewall

Permanent installation of the lower firewall today.

Firewall shimmed and level and clamped in position - ready for floxing.

Shop temperature 25 deg C and humidity 46%.

34g resin and 13g hardner mixed with flox.

Firewall floxed in position and curing.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.