Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
7-2-2017
< Previous Log Entry
Next Log Entry >
Date:
7-2-2017
Number of Hours:
2.00
Manual Reference:
Brief Description:
tape aft side of forward landing gear bulkhead
Workshop temperature was 25 deg C and humidity was 46%.
93g resin was mixed with 35g of hardner to make a batch of epoxy.
2-ply of BID cloth (1.5" x 32") was cut out along with a length of 2" wide peel ply to a length slightly longer than 32".
The peel ply from yesterdays 6-ply UND layup was removed.
The BID tape was wet out and epoxy was applied to the aft fact seam of the forward landing gear bulkhead.
A small batch of flox was mixed and applied to the joint to make a smooth transition for the 1.5" wide BID tape.
The 2-ply BID tape was applied and the peel ply was applied over top of the BID tape and left to cure.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.