KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  7-2-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  tape aft side of forward landing gear bulkhead

Workshop temperature was 25 deg C and humidity was 46%.

93g resin was mixed with 35g of hardner to make a batch of epoxy.

2-ply of BID cloth (1.5" x 32") was cut out along with a length of 2" wide peel ply to a length slightly longer than 32".

The peel ply from yesterdays 6-ply UND layup was removed.

The BID tape was wet out and epoxy was applied to the aft fact seam of the forward landing gear bulkhead.

A small batch of flox was mixed and applied to the joint to make a smooth transition for the 1.5" wide BID tape.

The 2-ply BID tape was applied and the peel ply was applied over top of the BID tape and left to cure.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.