KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  6-25-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Prepare for 6-ly UND layup

Sanded and vacuumed the aft face of the forward landing gear bulkhead.

Traced the shape onto paper where the 6-ply UND layup is to go on both the LH and RH sides.

Covered the paper with wax paper and taped 6 layers of UND cloth on top.

Two pieces of dacron were cut to fit over top of the layup.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.