Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
6-11-2017
< Previous Log Entry
Next Log Entry >
Date:
6-11-2017
Number of Hours:
1.50
Manual Reference:
Brief Description:
Tape the joint between upper and lower bulkhead
Two plies of BID cloth were cut to 33" x 1.5" to tape the joint between the bottom and top half of the landing gear bulkhead.
Shop temperature was 25 deg C and humidity was 51%.
Peel ply was removed from yesterday's 3-ply UND layups.
Epoxy was mixed together with 98g resin and 38g hardner.
The 2-ply BID tape was wet out and epoxy was lightly brushed on the bulkhead where the tape is placed.
A small batch of flox was mixed and applied to the joint between the upper and lower bulkhead to ensure a smooth transition for the cloth.
The tape was applied to the bulkhead joint and covered with peel ply.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.