KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  6-11-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Tape the joint between upper and lower bulkhead

Two plies of BID cloth were cut to 33" x 1.5" to tape the joint between the bottom and top half of the landing gear bulkhead.

Shop temperature was 25 deg C and humidity was 51%.

Peel ply was removed from yesterday's 3-ply UND layups.

Epoxy was mixed together with 98g resin and 38g hardner.

The 2-ply BID tape was wet out and epoxy was lightly brushed on the bulkhead where the tape is placed.

A small batch of flox was mixed and applied to the joint between the upper and lower bulkhead to ensure a smooth transition for the cloth.

The tape was applied to the bulkhead joint and covered with peel ply.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.