KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  2-25-2017
Number of Hours:  2.50
Manual Reference:  step 1
Brief Description:  Canard Reinforcements

Shop temperature was at 25 deg C and humidity was 44%.

4-ply BID cloth was cut for the reinforcement needed for the canard attach hard points. This is a corner layup on both sides (left and right) of bulkhead F-22 and the fuselage sides. Fiber orientation is at 45 deg and edges peel plied.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.