Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
1-21-2017
< Previous Log Entry
Next Log Entry >
Date:
1-21-2017
Number of Hours:
1.50
Manual Reference:
step 1
Brief Description:
Sand Seatback Joints
All of the front seatback locations where it mates with the fuselage side was sanded and vacuumed.
The seatback clamps were removed.
A piece of wax paper 8" x 31" was cut and lines drawn at 2" intervals.
Two pieces of BID cloth (at 45 deg orientation) were cut to fit over the wax paper.
The cloth will be cut into four 2" x 31" strips to be used as BID tape for the seatback joints.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.