KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  10-1-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Leveling RS fuselage side in jig

Front bulkhead F22 raised by 1/16" to be aligned with WL 23 at the top and confirmed alignment with centre of jig.

The right side of the fuselage side was sanded down so the side would be level at WL 23 at the front. i.e. the top longeron would be level with the top of F22.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.