Shop temperature was 27 deg C and the humidity was 47%.
30g of L335 epoxy resin was mixed with 11g of H340S hardner and injected using a syringe into the pre-drilled entry holes in the air gaps. Excess epoxy was wiped away from the entry and exit locations.