Date:  10-5-2014
Number of Hours:  1.00
Manual Reference:  Chapter 5
Brief Description:  Completed Top Longerons

Shop temperature was 80 deg F and humidity was < 75%.

Epoxy was mixed (46g resin & 17.5g hardner) and flox added.

Flox was applied with a paint brush to the 15.5" doublers. The doublers were clamped to the pre-marked locations on the top longerons. Clamps were used rather than nails.

Flox was applied to the two location for the 5.5" doublers. The 5.5" doublers were positioned properly then a board and bricks were placed on top to weigh them down while the flox cures.