KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  8-19-2011
Number of Hours:  3.50
Manual Reference:  Chapter 4
Brief Description:  fwd face landing gear bulkhead layups

Temperature started at 80deg F and humidity at 45%.
Micro was squeeg'd onto the foam surface and epoxy was lightly painted onto the hardpoints on the forward landing gear bulkhead (the piece with the hardpoints).
The layup consisted of 2 plies of BID and 1 ply of UND horizontally, peel ply, wax paper and then the layup was covered with a board and weighted down with bricks.

Temperature was 84deg F and humidity at 50%.
Micro was applied to the foam surface and epoxy to the hardpoints on the aft gear bulkhead.
The layup consisted of 2 plies BID, 2 plies UND horizontally, 8 plies UND (left and right sides) at angles as shown in the plans, peel ply, wax paper and then the layup was covered with a board and weighted down with bricks while it cures.
' style=

fwd bulkhead with hardpoint

fwd bulkhead with hardpoint

' style=

aft gear bulkhead

aft gear bulkhead

' style=

Curing

Curing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.