KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  7-3-2011
Number of Hours:  1.50
Manual Reference:  Chapter 4
Brief Description:  5-min epoxy hardpoints into landing gear bulkheads

The foam was trimmed with a utility knife to accommodate the hardpoint shapes. The shop, foam, and hardpoints were vacuumed to clean up the fiberglass dust. The temperature in the shop was 88 deg F and the humidity was reduced to 44% using a dehumidifier. 5-minute epoxy was used to fix all 4 hardpoints into the foam shapes for the landing gear bulkheads.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.