KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  2-8-2011
Number of Hours:  1.00
Manual Reference:  Chapter 4
Brief Description:  Instrument Panel cloth cutting for top/inside of s

The shop was vacuumed and the instrument panel and table cleaned up for the next layup. BID cloth was cut for the single ply layup on the top side of the horizontal stiffners and the inside of the vertical stiffners.
' style=

Cutting Cloth

Cutting Cloth

' style=

Preparing for layup

Preparing for layup

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.