KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  12-30-2010
Number of Hours:  2.50
Manual Reference:  Chapter 4
Brief Description:  Instrument Panel Forward Face Layup

The shop temperature was 80deg F and the humidity was 30%.

Jason Piecowye, Maintenance Manager at Beyond Blue Aerospace, helped with the layup.

Dry micro was applied as required to low voids on the foam.

Micro slurry was applied over the entire foam piece.

2 plies of BID @ 45degrees was glassed onto the foam.

1 ply of UND horizontally above the leg cutouts was applied.

Peel ply, wax paper, and wood/weights were added.
' style=

Jason mixing the epoxy

Jason mixing the epoxy

' style=

Layers of fiberglass

Layers of fiberglass

' style=

Peel Ply over the layup

Peel Ply over the layup

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.