KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  8-7-2010
Number of Hours:  0.50
Manual Reference:  Chapter 4
Brief Description:  F28 and F22 bulkheads ready for glass

Excess 5min epoxy was sanded off of the F22 foam piece.

The foam pieces and work table were vacuumed to remove the foam and epoxy dust.

The F28 and F22 bulkheads are ready to be glassed.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.