I wasn't satisfied with the jig 2,3,4 locations for leveling the 2' board so I repositioned everything and then re-installed the 2' board to be level with the jigs/water line and created a sketch to transfer the jigs to the other wing. The only datum point that i found consistent between both wings is point WPRP.
Inspected the top side and the inboard ends of the right wing. A list of repair locations was noted and preparation for the first repair started.