KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  2-26-2022
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Inspect top of right wing

I wasn't satisfied with the jig 2,3,4 locations for leveling the 2' board so I repositioned everything and then re-installed the 2' board to be level with the jigs/water line and created a sketch to transfer the jigs to the other wing. The only datum point that i found consistent between both wings is point WPRP.

Inspected the top side and the inboard ends of the right wing. A list of repair locations was noted and preparation for the first repair started.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.