KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  12-19-2020
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Canard Repairs

More sanding of rough spots along the top side of the canard.

Began the left tip repair with a small BID patch on the bottom of the tip over top of a crack.

Dry Micro was mixed and divets were filled in along the canard.
' style=

Left Tip

Left Tip

' style=

Right Elevator

Right Elevator

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.