I dont know why I had not already done this, but after doing all the work inside the fuselage and seeing these clecoes every time I crawled in, I decided to finish this. Done. So now the only place left to do any rivetting will be the last half of the baggage compartment. I got out my seatbelts and tried them on only to find out that I did not have enough AN5-5A bolts to install them. These are now on order. Also ordered more control cable so I can redo one of the elevator cables. When I tension it to 40 pounds, the turnbuckle has 5 to 6 threads showing which will not pass inspection.