Brief Description: Rollover bar and rear rube frame installed
Once I cleared the baggage area hurdle, I went to work on getting rollover bar and rear tube installed. Rollever bar painted black and rear tube covered with black heat shrink. Bolts installed in rollover bar and rear tube clecoed in place for rivetting. I still need to drill out the rear canopy to 5/16" for screws in rear tube and drill out canopy to 5/32" for rivets. This will be where I start tomorrow.