KitLog pro

Powered By Kitlog Pro v2.0

Lucs Web site
' style=
Date:  10-28-2005
Number of Hours:  5.00
Manual Reference:  
Brief Description:  right fuel tank

installed the tank bracket, had a little trouble getting properly lined up with leading edge, funny since the left wing was perfect the first time around. Well I had to re-drill the holes of the baffle and everything now lines up perfectly. Next step is match drill both tanks and leading edge and then dissassemble evrything to prime all the parts.My friend Francois came over and worked on fixing some lighting problem in our house. he's also the guy responsible for the extra lighting and power in my Garage...I'm sure he'll be usefull when wing riveting time comes along ;-)
' style=

very cool

very cool

' style=

My friend Francois

My friend Francois

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.