KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  4-22-2014
Number of Hours:  1.50
Manual Reference:  6-B-11, 13, 15
Brief Description:  Riveting the Forward Fuselage 3

Continued riveting the fuselage together this morning. Finished off all the A4 (1/8")-sized rivets on the right side and began work on the left side before knocking off for work. Had one bad rivet through the left side curved gusset. I updrilled the hole to A5 (5/32") to take advantage of the longer grip range of that rivet.
' style=

Outside of right side with all A4 rivets in place.

Outside of right side with all A4 rivets in place.

' style=

Inside of left side with all A4 rivets in place in the front cabin area.

Inside of left side with all A4 rivets in place in the front cabin area.

' style=

Painted firewall with side skins riveted in place.

Painted firewall with side skins riveted in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.