KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  1-25-2013
Number of Hours:  1.00
Manual Reference:  6-T-1A
Brief Description:  Front Spar

With the infamous 6T2-3 piece safely set back on the shelf, I began work on the Horizontal Stabilizer. Today I mostly pulled all the appropriate parts out and identified them in preparation for assembly. I also did some de-burring. The last thing I did before heading to work was mark the center of the spar and the doublers I was attaching to it. The instructions for this in the Photo Assembly Guide really hit home with me: "Mark the aircraft center line on the spar and on the doublers." Not the spar centerline, but the aircraft center line. This is one of those measurements you really do want to check twice ... or more!
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.