KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  9-25-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Right Wing Install Prep 2

Polished off the last items needed for installing the right wing. The tasks today included:

- Anchoring the nav/strobe wire bundle to the inboard wing rib in preparation for connecting it to the matching D-sub coming out of the fuselage. This included anchoring the wire bundle shielding too.

- Trimming the feed and return fuel lines to their final length.

- Shortening the fuel quantity wire to final length and crimping a male spade terminal to the end of it to go into the female spade terminal already positioned in the fuselage.

- Anchoring the feed/return fuel lines already in the cockpit to the floor in front of the passenger seat.
' style=

Nav/strobe wire bundle routed around aileron control cables.

Nav/strobe wire bundle routed around aileron control cables.

' style=

Fuel lines (feed/return) and fuel quantity wire ready for final installation.

Fuel lines (feed/return) and fuel quantity wire ready for final installation.

' style=

Fuel lines in the cockpit anchored in place.

Fuel lines in the cockpit anchored in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.