Powered By Kitlog Pro v2.0
Kupe's Zodiac 650B
Zodiac 650 B
Wings
10-18-2013
< Previous Log Entry
Next Log Entry >
Date:
10-18-2013
Number of Hours:
3.00
Manual Reference:
Misc
Brief Description:
Misc Tasks Before Left Wing Closing
Worked ona few odds-n-ends before closing up the wing to include:
- Adding the spanwise stiffeners to the top skin. These reduce oil-canning and help hold the wing shape in flight
- Tightening up the locknuts holding the aileron balance weights.
- Riveting in the wing locker inside walls.
- Adding safety wire to the aileron trim hinge.
- Final corrosion control paint to the top sides of all the ribs, spars,and channels.
The spanwise stiffeners riveted in place on the top skin.
The aileron balance weights fully attached to the balance bar.
Interior walls of the wing locker riveted into place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac 650 B Home
Category
# Logs
# Hours
All
774
1452
Avionics
35
54
Brakes
21
35
Canopy
38
72
Cockpit
34
54
Electrical
73
120
Engine
71
127
Flight Test
1
1
Fuel
26
48
Fuselage
136
252
Landing Gear
19
28
Miscellaneous
28
54
Polishing
8
24
Rudder
25
70
Shop
7
8
Stabilizer
37
77
Wings
215
428
Copyright © 2001-2024 Matronics. All Rights Reserved.