Spent the day prepping for tomorrow's first engine run. Primary tasks included:
- General cleanup around the aircraft. - Removed the upper and lower engine cowls. - Detailed run through the engine compartment inspecting wire/fuel/air connections and bolt security. - Pumped up the tires so the plane is ready to roll a little ways out of the hangar area. - Set up all the engine sensor indicators on the Dynon Skyview Engine Management System to conform to the ULPower engine limits in their operating manual (this took over an hour!). - Marked the position of 2 securing clips for the engine tailpipe for future welding.